In summary, we have executed the projects below:

DESCRIPTION CLIENT LOCATION

STATUS

Upgrade of 2” to 6” of automatic sampling and Mixing piping system and installation of Jiscot Pumps (Engineering, Procurement, Fabrication, Installation and Commissioning) Total ECP Nigeria OML99 AMENAM COMPLETED
Insulation services on 2” to 6” pipes. Total ECP Nigeria OML99 AMENAM COMPLETED
Calibration of high pressure pump gauges, recorders (Hydration & Haskel) AOS ORWELL PHC COMPLETED
Test, service , Calibration and certification of Fire and multi-gas detectors/monitor Total ECP Nigeria OML 99,100,102 ON-GOING
Nitrogen Purging and Vessel cleaning and preparatory works NAOC OB-OB COMPLETED
Critical intervention on land pumps(Maintenance and spare supply) Nigeria Agip oil company OB-OB COMPLETED
Fitting, overlay welding and Anti corrosion works and Commissioning of 12”, 14” and 16”  sea water filters and other ancillary accessories TOTAL ECP NIGERIA OML100 UNITY COMPLETED
Engineering, procurement, Fabrication, Blasting and Painting  and offshore Decommissioning and installation of Anchorage points . TOTAL ECP NIGERIA OML99

AMENAM

COMPLETED
Replacement and Servicing of 16” ESDV 1003 Valve  and Actuator on Ofon Gas supply line to Amenam TOTAL E&P AMENAM (OML 99) COMPLETED
Replacement of Piping for process Shutdown BW OFFSHORE FPSO ABO, LAGOS ONGOING
Repair, Testing and Return of Lufkin Gear Boxes (Agbami FPSO) CHEVRON AGBAMI SHORE BASE ONGOING
Servicing, Repair and Load testing of Winches and 11Ton Crane Snatch Blocks for Flare Tip Replacement TOTAL UPSTREAM IN NIGERIA DEEP WATER DIVISION 0ML 130 AKPO FPSO COMPLETED
• Pressure test and Nitrogen Purging of gas separator at Olomo Fs

• Commissioning of 2km 12” Gas Line

• Flushing /Pipe Cleaning services at PPMC Terminals (3”)

EDZACHARIAH ENERGY SERVICE LTD (JULIUS

IJERUH)

PPMC Rivers State COMPLETED